Concrete calculator: cubic yards, bags and mix

How much concrete you need for a slab, footing or patio in cubic yards, how many 60- or 80-lb bags of premix, or how much cement, sand and gravel to mix yourself.

Units
ft
ft
in
%
lb
lb
Concrete needed3.11 cu yd
Bags of premix140
Bags of cement18
Cement1,661 lb
Sand1.37 cu yd
Gravel2.74 cu yd
Water (approx.)100 gal

How to use

Enter the length, width and thickness of a slab, patio, sidewalk or footing, and add extra for spills and an uneven base. Then there are two ways to buy:

For a strip footing, choose it in “What to pour” and enter the total footing length (perimeter plus interior bearing walls), width and depth. For columns or piers, enter the diameter, height and count: each one is π × d² / 4 × height.

How it’s calculated

  1. Volume = length × width × thickness × (1 + extra). Concrete is ordered in cubic yards: 1 cu yd = 27 cu ft.
  2. An 80-lb bag of premix makes about 0.60 cu ft of concrete and a 60-lb bag about 0.45 cu ft, so one cubic yard takes about 45 bags of 80 lb or 60 bags of 60 lb.
  3. For a site mix, you need about 1.54 times the finished volume in dry materials — water and fines fill the gaps and the mix compacts. That’s the standard factor for mixes by volume. The dry volume is split by the ratio; cement is converted to pounds at a bulk density of about 90 lb/cu ft (1440 kg/m³).
  4. Water is a guide for a water-cement ratio of 0.5. Add it gradually until you reach the workability you need.

Which mix to choose

Ratios are by volume: cement : sand : gravel (for example, in buckets).

These are guides, not a guaranteed strength: that depends on the cement, the aggregate, the water and compaction. A 3,000 or 4,000 psi mix can’t be guaranteed from the ratio alone — for structural work, follow your plans or order ready-mix at the strength you need. Portland cement in the US comes in 94-lb bags, which is the default here.

Examples

FAQ

How much extra should I add? 5–10%: some concrete stays in the mixer and on tools, and the subgrade is rarely perfectly flat.

When is ready-mix worth it? For about a cubic yard or more. Many suppliers have a minimum order, and short-load fees apply below it.

Sand and gravel are sold by the ton — how do I convert? Roughly 1.3–1.4 tons per cubic yard for dry sand and about 1.4 tons for gravel. Check with your supplier.

For walls, use the brick calculator.